01 hour daily power cut will be in effect from today for a period of 04 days.
- 06 to 07 PM or
- 07 to 08 PM or
- 08 to 09 PM or
- 09 to 10 PM
An islandwide power failure was reported for several hours yesterday after a technical fault at the Kerawalapitiya Sub-station.
The technical fault had led to the Norochcholai power plant, which supplies power to the National grid, being inactive.
The PUCSL said the 900-megawatt Norochcholai power plant still remains off the grid.
The public have been urged to use electricity sparingly due to this reason, it added. (Newswire)